Connect with us








News

Rachana Construction Develops 25 MW Solar Plant Project at Dharashiv, Maharashtra

Mumbai, January 29, 2025: Rachana Construction Limited has announced a significant milestone with the development of a 25 MW solar power plant at Dharashiv, Maharashtra. This project underscores the commitment of the company towards sustainability and innovation and highlights an important cornerstone of its mission toward becoming the leaders in renewable energy. The solar plant will produce clean energy for 25 years, thus reducing the carbon emissions and enhancing the local economy through job opportunities and new technologies.

Managing Director of Rachana Construction Limited Sujit Dattatray Mule said, “This project demonstrates our single-minded dedication to innovative solutions that are guaranteed to create long-lasting value for communities and a greener future.”

The state-of-the-art PV modules and smart monitoring system, powered by the Internet of Things (IOT) and AI, will ensure operational efficiency with minimum downtime at the plant. The plant is expected to cut down carbon dioxide emissions to about 35,000 to 40,000 metric tons a year and about 1 million metric tons during its lifetime, equivalent to the removal of thousands of cars from the streets every year.

Around 200-300 temporary jobs will be created during construction, such as engineers, technicians, and labourers, while once operational, the plant will give 30-50 permanent jobs. Local suppliers will benefit as well, and the enhanced energy infrastructure will assist the development of the region.

Slide Up
x


Trending